The Lechmere Viaduct
Connecting the West End to Cambridge, the Lechmere Viaduct was constructed across the Charles River to solve an age old problem: traffic. Replacing an old bridge with an elevated right of way for streetcars, the Viaduct was part of a larger effort to make rapid transit easier in the early twentieth century. Today, it connects to the new Green Line Extension.
Traffic, and the frustrated commuters stuck in it, is not new to the modern era. As early as the late nineteenth century, streetcars in the Boston area became caught up in major traffic and delays. This was the reality of rapid transit between Cambridge and Boston before 1912.
Before the East Cambridge Viaduct was constructed, streetcars moved alongside street traffic. They traveled across the Charles River with pedestrians, carriages, and early automobiles on the old Craigie’s Bridge. The Boston Globe described the conditions as “vexatious” to commuters. It took ten minutes to go less than a mile from Lechmere Square to North Station. Solving this required an ambitious engineering project to lift rapid transit above street traffic.
East Cambridge
East Cambridge was mostly undeveloped farmland and marshland until the early 19th century. After the American Revolution, the Massachusetts General Court seized land there belonging to Loyalists. This seized land was sold off for development. Developers, railroad companies, and the City of Cambridge filled in mud flats and salt marshes to create the modern coastline.
By the 1880s, East Cambridge had become the industrial center of the city. This brought in an influx of diverse working-class immigrant families. It had also become a major transportation hub for freight and passenger trains, as well as local transit. Electric streetcars traveled through Lechmere Square, taking passengers between Boston, “Old Cambridge” (Harvard Square), Somerville, Medford, and beyond.
However, traffic was highly congested on Craigie’s Bridge, the crossing between Boston and Cambridge. Streetcars took ten minutes to go less than a mile between Lechmere and North Station (which would only be a twenty minute walk). The newly incorporated Boston Elevated Railway (BERy) identified the crossing as a major choke-point in the transit system.
Downtown Boston had had the same issue with streetcar traffic before. In 1897, Boston completed its own solution to this problem. It constructed the Tremont Street Subway, the first subway in the United States. This tunnel project moved streetcars away from street level and down into underground tunnels.
Building Over the Charles River
Craigie’s Bridge was removed in 1905. The Massachusetts General Court voted to replace it with a dam as part of the Charles River Basin project. The BERy joined in on this project with the construction of a new East Cambridge Viaduct. The viaduct would create a dedicated right-of-way for streetcars above the street. Construction began in June 1907 and ended in 1912.
The first streetcars traversed the Viaduct on June 1st, 1912. The project was praised in the Boston Globe. The paper reported trips from Cambridge to Boston were reduced from ten to an impressive three minutes. Understandably, “East Cambridge folk [were] much pleased” with the improvement.
Beyond improved travel times, the Viaduct and the boulevard on the Charles River Dam were considered an aesthetic upgrade over the aging Craigie Bridge. The Viaduct was designed by the firm Peabody and Stearns. It was meant to be an impressive component of the Charles River Basin project.
The Viaduct is approximately 1,700 feet long and has twelve spans. A drawbridge allowed cargo ships to access East Cambridge, Kendall Square, and Harvard Square. However, its usefulness for these larger ships was short-lived. Larger schooners were blocked from going further upriver by the Longfellow Bridge. The lock of the Charles River dam was fixed open in the 1970s after the new dam was completed making the earlier locks irrelevant. The Viaduct’s draw bridge still exists, but it has not been used in decades.
The Viaduct was installed with steel bumpers to keep trolleys from driving into the river when the drawbridge was open. This was particularly relevant at the time. During the 1916 Summer Street Bridge Disaster, a trolley did not stop for an open drawbridge and plummeted into the Fort Point Channel. Forty-seven people were killed in the incident. The Viaduct’s bumpers remained in place until 2011.
The Viaduct wasn’t a perfect fix. Streetcars still encountered heavy traffic while navigating city streets. Lechmere was designated as the terminus for streetcar service and a transfer point. Commuters had to transfer to another train to get into Boston. This was done to prevent Cambridge street traffic from causing delays in the subway system in Boston.
When the Viaduct first opened, East Cambridge residents could go many places, not only to Boston, via the streetcar. Yet, in 1936, Cambridge streetcar tracks were abandoned and replaced with trackless trolley service. After that, streetcars at Lechmere only went into Boston. The station eventually became the terminus of the E Branch of the Green Line.
In 1955, the MTA (which took over the BERy’s operations in 1947, and later became the MBTA) opened the West End/Science Park stop on the Boston side of the Viaduct.
The Viaduct in the 21st Century
As part of the “Big Dig” project to depress the Central Artery, Massachusetts was required to invest in rapid transit infrastructure. The Green Line Extension (GLX) was the primary component of this investment. It extended E Branch service from Lechmere into Somerville and Medford, adding five new stations. It also extended D Branch service to the new Union Square station in Somerville via Lechmere. The branches were built next to the existing right-of-way for the Lowell and Fitchburg Commuter Rail tracks.
As part of this project, the MBTA conducted a two year rehabilitation project of the Viaduct and Lechmere Station. The project cost $87.4 million. Crews renewed tracks, signals, and the overhead wires of the catenary system. The project also made accessibility improvements, and reinforced all twelve spans of the bridge.
The construction of the Viaduct reflected feelings of optimism and ambition about transit in the Boston area. The Boston Globe reported in 1912 that the elevated railway was “the latest link in the chain of the rapid transit system of Boston, which is so rapidly being perfected.”
Today, the MBTA faces significant budget shortfalls after years of underfunding and delayed maintenance. However, due to soaring oil prices and changing commuting patterns, demand for transit is increasing. With more investment and infrastructure, the MBTA may yet recapture the enthusiasm of the public and press which once heralded the opening of the Lechemere Viaduct.
Article by Nick LaCascia, edited by Jaydie Halperin
Sources: Boston Globe January 18, 1903, March 10, 1905, June 5, 1905, June 11, 1910, May 28, 1912, June 1, 1912, June 11, 1922; Boston Streetcars, “The Building—and Cancellation—of Boston’s Rapid Transit Extensions,” (2015); Cambridge Historical Commission, “Survey of Architectural History in Cambridge: East Cambridge”, 2nd edition(Cambridge:MIT Press, 1989); Adam Gaffin, “When trolleys crossing the Lechmere had to stop for boats” ,(Universal Hub, June 18, 2020); MBTA, “Lechmere Viaduct Rehabilitation” (2022).